Business Center – HCE 3.72
Select this to download program files that include these enhancements:
* The program has been revised to present an error message “Stockpile/Depression option cannot be used with surface trimmed with boundaries” when the Earthwork Report is run with a surface that has been trimmed with boundaries and the Stockpile/Depression option is used. Users should remove any boundaries in the surface and use a boundary line with this option. Previously the base of the stockpile would be formed considering the entire surface including the triangles being hidden by the surface boundary.
* When images are imported, all view filters are now updated with the selectable flag for Georeferenced Images disabled.
* Improved visualization and reporting performance of the Dynamic Compaction data.
* The program has been revised to check whether the user clicks the Esc key to interrupt long running earthwork reports.
And bug fixes for cases in which:
* There was an incorrect tooltip on the Ribbon below the Reports dropdown.
* An error occurred with grip when a linestring was an arc.
* An error occurred when a wrong point was picked using the Apply Rectangular Clipping Boundary in the Georeference vector PDF command.
* A correction was made to the exporting of point symbol blocks to DWG/DXF.
* An exception occurred when the file path was too long.
* The DC file Importer incorrectly used a rectified projection for some coordinate systems having an unrectified Oblique Mercator Angle projection.
* An error in the calculations of material procurement cost when a material was used in more than one site improvement within a site improvement category was corrected.
Recent Posts
Beyond the Total Station Exploring Modern Alternatives to Traditional Surveying
The "Total Station" on a tripod has been the symbol of surveying for decades. But as construction speeds up, the industry is looking for alternatives that provide more data in less time. If you find...
The Ultimate Guide to Choosing a Reliable Construction Surveying Partner
Choosing a construction surveying partner is one of the most critical decisions a project manager can make. In the high-stakes world of Canadian construction—where winter schedules are tight and...
